Schematic Design
Question of the Week:
Which Answer is NOT Correct?
We may need to proceed to design when there are still unknowns, but, at a minimum, we should:
A.
Have a reliable measurement of the existing space
B.
Be unconcerned about budget until after design completion
C.
Have a list of all functional spaces required